| Testing Required |
Testing Purpose |
| Voltage drop test |
To check voltage difference between to point |
| Impedance test |
To measure the impedance between V bus to GND and D+ to D- |
| Resistance test |
To measure the resistance value between connector to connector (V bus to B bus, GND to GND, D+ to D+ and D- to D-) |
| Dimension verification test |
To check all dimension and American wire gauge (AWG) |
| I/O connector test |
To check cable performance |
| Wire bending test |
To check torsional effect |
| Salt spray test |
To check rust on cable metal point |